000 01459nam a22002057a 4500
003 OSt
005 20220310101055.0
008 220121b |||||||| |||| 00| 0 eng d
020 _a9788412333138
040 _ckrvia
082 _a724.6
_bELC
100 1 _aCecilia, Fernando (Ed.)
_9116
245 1 0 _aEl Croquis: Roger Boltshauser, Impure Materiality 2002 - 2021
260 _aSpain
_bEl-Croquis
_c2021
300 _a331p.
365 _aRs.
_bRs. 6784
_cRs.
_d0
_eRs.6784
505 _aA Conversation with Roger Boltshauser Hybrid System by Jonathan Sergison p.6, Equipment Storage Buildings and Finishing tower Sihlholzli p.28, Rauch House p.36, Conversation of Studio building on Dubsstrasse p.58, Allenmoos II School Pavilion p.72, Hirzenbach Residential High Rise p.88, Ozeanuum, Basel Zoo p.104, Krameracker Primary School p.118, Office Building Renovation on Bleicherweg p.146, Renovation of Low Rise Buildings in Hirzenbach p.162, Steel House Case study p.174, Ingenbohl convent Retirement Center p.184, H1 Zwhatt Areal High Rise p.190, Baufeld F Europaallee p.200, Wasserwerke Zug Office p.224, Sitterwerk St Gallen Mock up p. 238, Kiln Tower for the Brickworks Museum, Cham p.244, New DTB Operations Building, St. Gallen p.256, Oerlikon Sports and Swimming Center p.264, ZZM Dentistry Center, University of Zurich p.274, Residential Development Altwiesen p.286, GLC Research Building, ETH p.294
650 1 0 _aArchitectural Design
942 _2ddc
_cBK
999 _c9523
_d9523