000 01938nam a22001937a 4500
003 OSt
005 20240606104619.0
008 230218b |||||||| |||| 00| 0 eng d
020 _a9788195843008
040 _ckrvia
082 _a720.288
_bART
100 1 _aArt Deco Mumbai Trust
_94898
245 1 0 _aThe Swastik Court Handbook: Repairs and Restoration: Lessons from the Field
260 _aMumbai
_bArt Deco Mumbai Trust
_c2022
300 _a115p.
505 _a1. Introduction p.5, 1.1 Unesco World Heritage Site: The Stakeholder Initiative p.5, 1.2 Backbay Reclamation Scheme: Building a New City from the Sea p.10, 2. Scope of Work | What we set out to do: 2.1 Project Overview: A Context p.15, 2.2 Swastik Court: Facts and Figures p.16, 2.3 Memorandum Of Understanding With The Residents: Framing the Dialogue p.18, 3. Methodology | The Approach we took: 3.1 Authenticity And Integrity: The Non-Negotiable p.19, 3.2 Building Significance and Philosophy of Conservation: The least you do is the best you can p.20, 4. Building Materials & System, Diagnoses And Recommendations | Project Inheritance and Implementation p.22, 4.1 Terrace Flooring the Home of the Swastik Mosaic p.24, 4.2 Balconies Respite from the Elements p.30, 4.3 Windows a room with a view (of the oval) p.33, 4.4 Colour Scheme and Banding Details the Accentuation p.35, 4.5 Lobby: A Glimpse of what is to come p.38, 4.6 Architectural Lettering: A modern twist to a building name p.52, 4.7 Bas - Relief Panels: Hidden in plain sight p.54, 4.8 Compound wall: Rediscovering the form p.63, 5. Interviews | Through the human lens p.73, 6. Consultations | Who we turned to when we didn't know p.93, 7. In Conclusion | Lessons from the field p.95, Glossary p.101, The Art Deco Mumbai Project Team p.100, Acknowledgements p.100, Appendix p.101, I. Compilation of Drawings p.102, II. Documents Shared with the Residents p.110
650 1 0 _aConservation
942 _2ddc
_cBK
999 _c9937
_d9937